The past two weeks brought additional rock placement and concrete pouring. It appears that the only remaining item if fence installation and a small amount of concrete work so that wheelchairs can get from the parking lot into the park.

Below are a few photos shot this weekend. More photos at the Construction photo gallery.

Benches awaiting installation on the concrete pads, shown as the round circles in the rear of the photo.

Decorative rocks. A bit too small to be much of a play structure for dogs, but provide some visual breakup of the surface.

Stormwater control trench and drain at the top of the park.

The main play area.